State enterprise · Power

臺電

The state generation and grid operator whose system serves demand concentrated on one plain — efficient, with poor resilience characteristics, and the subject of a ten-year hardening programme.

進行中 State-owned Announcements only

評估截至
2026-08
最後檢視
2026-10-21

評估中等信心

不含財務資料,也不含預測。一筆紀錄所載的,是已公布來源對一個組織、其已公布設施及其附日期說法的陳述,每項說法依類別分開。此處沒有任何內容是對任何公司的看法。

What this organisation is

Taiwan Power Company runs the island's generation and transmission. The March 2022 "303" failure, which cut supply to some 5.49 million households and halted semiconductor, cement and petrochemical plants, made grid resilience a political question rather than an engineering one. Taipower's answer, announced in September 2022, is the Grid Resilience Strengthening Construction Plan: NT$564.5bn over ten years to 2031, of which NT$437.9bn is distributed-grid work, NT$125bn reinforcement and NT$1.69bn protection, with dedicated microgrids intended to serve the science parks directly. It is a committed programme, not a completed one: in May 2026 the premier said the president had asked for it to be finished in 2028, ahead of schedule. The operator also reports coal holdings above the statutory floor of about 30 days.

The operator on which the semiconductor clusters' continuous power depends, and the organisation whose published programme is the measure of how far that dependence has been hardened.

信心:中等 截至2026-08檢視於2026-10-21

Official name: Taiwan Power Company

Dated claims — announced against delivered

Every claim on this record is an announcement or a target. Nothing here is recorded as commissioned or delivered.

2026-05目標 信心:高

Completion brought forward to 2028: the premier said on 6 May 2026 that the president had asked for the programme to be finished ahead of its original schedule, and that earthquakes and storms had made its execution and timing difficult. No delivered share was published with the target.

來源: Executive Yuan — whole-of-society resilience and cross-ministry programmes↗

Systems it belongs to

Supply systems it runs on

Commodities and outputs

液化天然氣與能源進口

Owners, controllers and arrangements

仍然未知的事項

  • No published figure for the share of the resilience programme delivered to date was read; the record carries the commitment and the horizon.
  • The Executive Yuan describes the 2028 target as four years early, which implies a 2032 end to the original plan; this record carries 2031 from the 2022 announcement, and the original end year has not been re-read.

評估截至 — 2026-08 最近檢視 — 2026-10-21